Strip Fast, Save More
Fineslab Early-Stripping Forming system
The Fineslab Early-Stripping Forming System simplifies the construction of complex slab structures through innovative design. It is widely suitable for various story heights and slab thicknesses, requires no mechanical lifting during assembly, and can be quickly installed manually. The system’s intelligent early-stripping solution significantly improves formwork turnover efficiency, thereby optimizing both material and labor costs, delivering outstanding cost-effectiveness compared to traditional support systems.

Our engineers have demonstrated remarkable ingenuity by adding only one component to the Fineshore M60 Shoring System, successfully enabling early slab stripping functionality. This innovation significantly reduces both material and labor costs for projects.
Wenma Zhang: Chief Executive Officer

One Head, Smarter Upgrade.
A New Realm of Early Stripping
One Key Component, Unlocks Greater Efficiency
The essence of the Fineslab Early-Stripping Forming System lies in a smart upgrade to the Fineshore M60 Shoring System: the addition of just one key component—the Wise-Owl Adjustable Early-Stripping Head. This allows the system to retain its excellent vertical load-bearing capacity while effortlessly enabling the early-stripping of horizontal formwork. Engineered with the same load-bearing grade as the Fineshore M60 Vertical Standard, the stripping head can safely adapt to slabs of various thicknesses. This minimal upgrade achieves a major functional breakthrough.
Early Strip, Win with Smart Savings
Accelerate Cycles, Multiply Efficiency
Early-Stripping Forming System is an efficient formwork shoring technology designed to accelerate concrete slab construction cycles and reduce material and labor costs. Its core principle involves an innovative early-stripping head design, which allows for the early removal of formwork panels, primary and secondary beams, and certain components once the concrete reaches a specified strength (typically about 70% of the design strength, approximately 24-48 hours), while the Vertical Standard remain in place to continue bearing loads. This enables rapid turnaround of formwork components.
The Fineslab Early-Stripping Forming System adheres to standards such as ACI 301. With a minimalist design philosophy, it provides users with the option for early formwork stripping through innovations in both the product system and construction methodology. This approach facilitates early turnover of formwork, significantly reducing the required quantity of formwork panels and support components.


Fully Compatible, Fully Efficient
Standard or Yours, Efficiency and Savings
The Fineslab Early-Stripping Forming System offers exceptional flexibility in secondary joist beam configuration. It not only provides standard system options like the Buster Perforated Beam, Aluminum Beam H100,Light-Cavalry Beam ST05 or H20 Timber Beam, but also seamlessly accommodates various user-supplied timber or aluminum beams. This enables projects to fully utilize existing inventory, thereby maximizing resource efficiency.




Forged in China’s Landmarks,
Supporting Global Infrastructure
High Formwork, Heavy Load, Early Strip for Efficiency
Over the past two decades of China’s rapid economic development, a vast number of infrastructure projects—including airports, high-speed rail stations, stadiums, commercial complexes, large industrial plants, logistics centers, data centers, and major bridges—have been constructed. The majority of these projects relied on high-formwork systems for support. Wenma’s Fineslab Early-Stripping Forming System has been deeply involved in most of these landmark projects, accumulating extensive on‑site experience.
In recent years, the system has also expanded internationally along the Belt and Road Initiative, providing reliable support for large‑scale infrastructure projects worldwide. It is particularly well‑suited for high‑formwork applications with heights exceeding 4 meters and high load requirements, achieving an outstanding balance of safety, efficiency, and economy.

Safety and Compliance are Our First Priority
Early-Stripping Forming System is fully aligned with major international standards, including EN, AISC and GB. Every component undergoes end-to-end precision quality control and 100% pre-shipment inspection to ensure exceptional reliability. With a Class A fire rating, our system delivers impeccable on-site safety assurance.